T4J

Backup Power Solutions for Cavern's Colocation Data Centers



Learn how Cavern Technologies expanded its operating space up to 120,000 square feet--with an additional 100,000 square feet for future expansion--making Cavern one of the largest data centers in the Kansas City region. Featuring three customizable gensets each with a 500 kWe output, sizing software was key to determining the right size to provide an uninterruptible power supply.


Learning Objectives:
1. Discuss the keys to designing for today’s data center capacity and future growth
2. Identify the benefits of genset controllers
3. Learn about key features of master control panels
4. Analyze the benefits of paralleling engines in genset projects

 

Start Time: 10/24/2017 3:30:00 PM
End Time: 10/24/2017 4:30:00 PM

Presented by:

Brian Ponstein
Regional Sales Engineer
MTU Onsite Energy

Read Bio


Room Number: J

Audience: Intermediate

CEU: 0.1

Track:

Project SpotlightVIEW ALL

VIEW SESSIONS BY DAY: